Located in Townsville, Queensland of Australia, Phase I of Haughton PV Power Plant commenced operation in 2019 with full capacity of 100 MW. It reduces CO₂ emissions by over 320,000 tons each year.
Located in Tuy Phong, Bình Thuận Province of Vietnam, the 30 MW Vinh Hao I solar farm commenced operation in 2019. It provides 50 million kWh of clean power each year, which saves 15,900 tons of Standard Coal.
Located in the northern part of Chihuahua State, Mexico, the 182 MW Santa María solar farm commenced operation in February, 2019. It supplies over 249,000 local families with clean energy and reduces about 207,000 tons of CO₂ emissions per year.
Located in Chihuahua, Mexico, Ka has a total installed capacity of 182 MW, which will be put into operation in 2019, and can supply 249000 households with clean energy power, reducing the carbon dioxide emissions by 207 thousand tons per year.
Located in the Jalisco State, Mexico, the 296 MW Potrero PV plant commenced operation in September, 2021, is one of the largest operational PV plants in Mexico. It supplies over 128,000 local families with clean energy and reduces about 440,000 tons of CO2 emissions each year.
Located in Karaganda, Kazakhstan, with an installed capacity of 40MW, it is the first photovoltaic power station of China Power International in Kazakhstan. The project was put into operation in 2019, bringing 63 million kilowatt-hours of clean electricity to local residents every year and reducing 53000 tons of carbon dioxide emissions.